Case study · Angola
55 tonnes of hardware on a single flight: Budapest to Luanda
The hardware of a national passport biometrics system had to be moved from Hungary to Angola – intact, traceable and in the order of installation.
The challenge
To introduce a national passport biometrics system, several tens of tonnes of hardware had to be moved from Hungary to Angola. The packages had to arrive intact, traceable and in line with the installation sequence – from the central site in the capital through the regional offices to the missions abroad.
Our role
On the supplier side we handled the full project management, so in logistics too we oversaw everything from the hardware to the licences. Our consultant led the logistics leg, from the handover in Budapest to the delivery to the last office.
What we did
- Preparation in BudapestReceiving and inventorying the hardware, planning, prioritising and carrying out the packing, and coordinating with the logistics partner.
- Air freightWe supplied the supplier's logistics team with the data needed to order a Boeing 747 freighter. This launched the first direct Budapest–Luanda flight, carrying 55 tonnes of hardware.
- Receipt and distribution in AngolaWe took over the shipment at its destination. Together with colleagues we directed the unpacking needed for testing, the preparation of transport and the delivery from the Luanda warehouse to the central site and then to the disaster-recovery (DR) site in Huambo.
- Installation preparationWe organised the pre-installation of the thick clients, the round-trip transport between the warehouse and the installation site, and the repacking of the devices.
- Nationwide deliveryFor every office where passport biometric data capture takes place, we assembled units packed ready for shipment. We did the same for the missions abroad, with a per-package inventory and unique identifiers.
- Sites in LuandaTogether with local partners we carried out the delivery and installation at the offices in the capital – 12 sites in total, from the outskirts to the Ministry of the Interior.
The route
Budapest → Luanda: the first direct flight, carrying 55 tonnes of hardware.
Result
55 tonnes of equipment on a single direct flight, from Budapest to Luanda.
The system was installed at the central and DR sites, at offices across the country and at the missions abroad, in the planned order and with full traceability.